This Kitchen remodel was carried out in Essex for our client, it involved:​

Removal of Asbestos Artex & Asbestos Floor tiles under CAR 2012 regulations. Removal of an old wall to old coal shed and extra support to the beams.​

All the walls were newly dry-lined with a new plasterboard ceiling with LED down lighters installed which can be controlled by WIFI on a mobile or via the switch mounted on the wall. These switches are a new technology which do not require cables or batteries to operate.​

All cables were hidden away and new appliances installed (Double Oven, Hob,Microwave & Extractor), this was followed on by tiling half way up the wall all around the kitchen area.

The new tall & deep cabinets was just what the client wanted and set off by undercounter lighting.

The client picked a lovely metallic green door to add a splash of colour to the kitchen.

The install of new plug sockets with USB outputs really makes this kitchen.

The clients tenant is over the moon with the install.